Aside section
Cases
How to avoid the failure to deliver orders on time due to production operational planning with IT-Enterprise
Timely execution of customer orders due to efficient planning of production capacities operational load.
How industrial enterprise Interipe holding reduced the equipment downtime by 30% with IT-Enterprise.EAM
Implementation of IT-Enterprise.EAM system let Interpipe holding to reduce maintenance costs, carry out production equipment repairs based on information about their current condition, ensure high reliability of equipment operation with preventive repairs where failure probability becomes high.
Interpipe's digital transformation of manufacturing
Interpipe is an integrated pipe and wheel company, a member of the TOP 10 list of the world’s largest seamless pipes’ producers.
Smart Manager electronic document management system in the Ministry of Education and Science of Ukraine
A 30% reduction in document processing time in the Ministry of Education and Science of Ukraine thanks to the introduction of the Smart Manager module of the complex ERP system IT-Enterprise.
Implementation of electronic document management based on IT-Enterprise Smart Manager in the Ministry of Infrastructure of Ukraine
Transition to the creation and processing of state-level documents in electronic form due to the introduction of an electronic document management system based on the SmartManager module of an integrated IT-Enterprise ERP system.
Optimal recruitment with IT-Enterprise.Recruitment
Optimal recruitment organized at the large industrial enterprise "Interpipe" with the help of IT-Enterprise solution.
Unified accounting system for a large distributed manufacturing enterprise
How IT-Enterprise team has created a unified accounting system in the large distributed enterprise "Antonov"
SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe
Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.