Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Industrial giant Zorya-Mashproekt digitalization reduced product development time by 1/3 and helped to enter new markets

Industrial giant Zorya-Mashproekt digitalization reduced product development time by 1/3 and helped to enter new markets

Having an integrated ERP system from IT-Enterprise, Zorya-Mashproekt has successfully implemented a large-scale digital transformation project, switched to electronic document management and become more globally competitive.  

Accurate Online Costing at Rivne Plant of High-Voltage Equipment

Accurate Online Costing at Rivne Plant of High-Voltage Equipment

Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.

Effective operational production management with the help of Smart Manager in JSC "FED"

Effective operational production management with the help of Smart Manager in JSC "FED"

FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.