IT.UA - home page

Aside section

Cases

Leadtime reduced by 40-60% for all types of products

Leadtime reduced by 40-60% for all types of products

Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Industrial giant Zorya-Mashproekt digitalization reduced product development time by 1/3 and helped to enter new markets

Industrial giant Zorya-Mashproekt digitalization reduced product development time by 1/3 and helped to enter new markets

Having an integrated ERP system from IT-Enterprise, Zorya-Mashproekt has successfully implemented a large-scale digital transformation project, switched to electronic document management and become more globally competitive.  

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant

Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

Unified accounting system for a large distributed manufacturing enterprise

Unified accounting system for a large distributed manufacturing enterprise

How IT-Enterprise team has created a unified accounting system in the large distributed enterprise "Antonov"

RZVA: accurate prime cost planning in online mode

RZVA: accurate prime cost planning in online mode

Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.

Production volume increased by 30% due to operational control of production

Production volume increased by 30% due to operational control of production

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

A unified IT-Enterprise ERP-system for Roshen Corporation

A unified IT-Enterprise ERP-system for Roshen Corporation

Thanks to the unified information platform implemented on all assets of Roshen corporation, the transparency and manageability of Roshen's business has increased.

Plant production throughput doubled, leadtime decreased by 15-20%

Plant production throughput doubled, leadtime decreased by 15-20%

How with the implementation of the IT-Enterprise system has increased the quality of decision-making , the capacity of the plant has increased 2-fold, and the duration of the production cycle has decreased by 15-20%

Work in progress reduction by 15% in engineering due to operational production planning

Work in progress reduction by 15% in engineering due to operational production planning

How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system