IT.UA - home page

Aside section

Cases

SE "UKRSPIRT": successful transformation of the industry leader

SE "UKRSPIRT": successful transformation of the industry leader

One of the successful projects in 2018 is effective cooperation with the state enterprise “UKRSPIRT”. For the year of the enterprise modernization project, the results are already impressive today.

How to avoid the failure to deliver orders on time due to production operational planning with IT-Enterprise

How to avoid the failure to deliver orders on time due to production operational planning with IT-Enterprise

Timely execution of customer orders due to efficient planning of production capacities operational load

How industrial enterprise Interipe holding reduced the equipment downtime by 30% with IT-Enterprise.EAM

How industrial enterprise Interipe holding reduced the equipment downtime by 30% with IT-Enterprise.EAM

Implementation of IT-Enterprise.EAM system let Interpipe holding to reduce maintenance costs, carry out production equipment repairs based on information about their current condition, ensure high reliability of equipment operation with preventive repairs where failure probability becomes high.

Interpipe's digital transformation of manufacturing

Interpipe's digital transformation of manufacturing

Interpipe is an integrated pipe and wheel company, a member of the TOP 10 list of the world’s largest seamless pipes’ producers.

Leadtime reduced by 40-60% for all types of products

Leadtime reduced by 40-60% for all types of products

Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

An efficient production management with the SmartManager

An efficient production management with the SmartManager

FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise.SmartManager

Plant production throughput doubled, leadtime decreased by 15-20%

Plant production throughput doubled, leadtime decreased by 15-20%

How with the implementation of the IT-Enterprise system has increased the quality of decision-making , the capacity of the plant has increased 2-fold, and the duration of the production cycle has decreased by 15-20%

A unified IT-Enterprise ERP-system for Roshen Corporation

A unified IT-Enterprise ERP-system for Roshen Corporation

Thanks to the unified information platform implemented on all assets of Roshen corporation, the transparency and manageability of Roshen's business has increased.

Production volume increased by 30% due to operational control of production

Production volume increased by 30% due to operational control of production

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.