IT.UA - home page

Aside section

Cases

Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Project for Olvia stevedoring company: from the transport center to the logistics platform

Project for Olvia stevedoring company: from the transport center to the logistics platform

The experience of building a single information environment based on the industry-specific solution of e-Port IT-Enterprise system.

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant

Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

Optimal recruitment with IT-Enterprise.Recruitment

Optimal recruitment with IT-Enterprise.Recruitment

Optimal recruitment organized at the large industrial enterprise "Interpipe" with the help of IT-Enterprise solution.

A unified IT-Enterprise ERP-system for Roshen Corporation

A unified IT-Enterprise ERP-system for Roshen Corporation

Thanks to the unified information platform implemented on all assets of Roshen corporation, the transparency and manageability of Roshen's business has increased.

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.

“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms

“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms

How the industrial-construction group "Kovalska " reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise

Effective operational production management with the help of Smart Manager in JSC "FED"

Effective operational production management with the help of Smart Manager in JSC "FED"

FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system