Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Project for Olvia stevedoring company: from the transport center to the logistics platform

Project for Olvia stevedoring company: from the transport center to the logistics platform

The experience of building a single information environment based on the industry-specific solution of e-Port IT-Enterprise system.

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant

Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.

The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise

The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise

Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.

A unified IT-Enterprise ERP-system for Roshen Corporation

A unified IT-Enterprise ERP-system for Roshen Corporation

Thanks to the unified information platform implemented on all assets of Roshen corporation, the transparency and manageability of Roshen's business has increased.

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe

Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.

“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms

“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms

How the industrial-construction group "Kovalska " reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise