Aside section
Cases
![Optimal recruitment with IT-Enterprise.Recruitment Optimal recruitment with IT-Enterprise.Recruitment](/static/img/lazy-bg.png)
Optimal recruitment with IT-Enterprise.Recruitment
Optimal recruitment organized at the large industrial enterprise "Interpipe" with the help of IT-Enterprise solution.
![Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning](/static/img/lazy-bg.png)
Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system
![30% Bigger Output with Operational Production Control at Zorya-Mashproekt 30% Bigger Output with Operational Production Control at Zorya-Mashproekt](/static/img/lazy-bg.png)
30% Bigger Output with Operational Production Control at Zorya-Mashproekt
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production
![Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle](/static/img/lazy-bg.png)
Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.