IT.UA - home page

Aside section

Cases

Thanks to IT Enterprise Smart Manager, Kyivvodokanal reduced document processing time by 24%

Thanks to IT Enterprise Smart Manager, Kyivvodokanal reduced document processing time by 24%

How, thanks to the implementation of IT-Enterprise.SmartManager, Kyivvodokanal reduced the processing time of documents by 24%

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system