IT.UA - home page

Aside section

Cases

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

30% Bigger Output with Operational Production Control at Zorya-Mashproekt

How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle

Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning

How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system

Effective use of a high-value tool under the control of IT-Enterprise in JSC "FED"

Effective use of a high-value tool under the control of IT-Enterprise in JSC "FED"

How modern production enterprise, reduced by 15% cost of acquiring expensive tools due to implementation of the IT-Enterprise ERP system, which has a unique tool control and planning system.

“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms

“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms

How the industrial-construction group "Kovalska " reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise