Aside section
Cases
Smart Manager electronic document management system in the Ministry of Education and Science of Ukraine
A 30% reduction in document processing time in the Ministry of Education and Science of Ukraine thanks to the introduction of the Smart Manager module of the complex ERP system IT-Enterprise.
Implementation of electronic document management based on IT-Enterprise Smart Manager in the Ministry of Infrastructure of Ukraine
Transition to the creation and processing of state-level documents in electronic form due to the introduction of an electronic document management system based on the SmartManager module of an integrated IT-Enterprise ERP system.
Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise
Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system
30% Bigger Output with Operational Production Control at Zorya-Mashproekt
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production
Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.
Thanks to IT Enterprise Smart Manager, Kyivvodokanal reduced document processing time by 24%
How, thanks to the implementation of IT-Enterprise.SmartManager, Kyivvodokanal reduced the processing time of documents by 24%