Aside section
Cases
Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Project for Olvia stevedoring company: from the transport center to the logistics platform
The experience of building a single information environment based on the industry-specific solution of e-Port IT-Enterprise system.
Accurate Online Costing at Rivne Plant of High-Voltage Equipment
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.