Aside section
Cases

DTEK Group: annual performance appraisal for 21,000 employees with IT-Enterprise corporate solution
The project consisted of implementing an enterprise solution, adapting and developing interfaces (front end), and optimizing the business processes (back end).

"Rivne High-Voltage Equipment Plant" reduced the TVC by 40-60% for all types of products thanks to IT-Enterprise
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

INTERPIPE organized optimal personnel selection using recruiting tools from IT-Enterprise
Optimal recruitment organized at the large industrial enterprise "Interpipe" with the help of IT-Enterprise solution.

"Rivne High-Voltage Equipment Plant" implemented accurate online product cost planning together with IT-Enterprise
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.

"Kovalska" reduced losses by 2 times due to the use of incorrect production standards on the IT-Enterprise platform
How the industrial-construction group "Kovalska" reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system

The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise
Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.