"Rivne High-Voltage Equipment Plant" reduced the TVC by 40-60% for all types of products thanks to IT-Enterprise
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

INTERPIPE implemented an effective transformation of production using Smart Factory from IT-Enterprise
Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.

"Zorya"–"Mashproekt" increased production output by 30% thanks to operational production control on the IT-Enterprise platform
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise
Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system

JSC "FED" effectively manages operational production management with the help of Smart Manager from IT-Enterprise
FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.