Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise
Accurate Online Costing at Rivne Plant of High-Voltage Equipment
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.
“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms
How the industrial-construction group "Kovalska " reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise
Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system
The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise
Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.