Cases

DTEK Group: annual performance appraisal for 21,000 employees with IT-Enterprise corporate solution
The project consisted of implementing an enterprise solution, adapting and developing interfaces (front end), and optimizing the business processes (back end).

"Rivne High-Voltage Equipment Plant" reduced the TVC by 40-60% for all types of products thanks to IT-Enterprise
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Smart Manager electronic document management system in the Ministry of Education and Science of Ukraine
A 30% reduction in document processing time in the Ministry of Education and Science of Ukraine thanks to the introduction of the Smart Manager module of the complex ERP system IT-Enterprise.

Implementation of electronic document management based on IT-Enterprise Smart Manager in the Ministry of Infrastructure of Ukraine
Transition to the creation and processing of state-level documents in electronic form due to the introduction of an electronic document management system based on the SmartManager module of an integrated IT-Enterprise ERP system.

"Rivne High-Voltage Equipment Plant" implemented accurate online product cost planning together with IT-Enterprise
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.