Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment

Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation

Project for Olvia stevedoring company: from the transport center to the logistics platform

Project for Olvia stevedoring company: from the transport center to the logistics platform

The experience of building a single information environment based on the industry-specific solution of e-Port IT-Enterprise system.

Accurate Online Costing at Rivne Plant of High-Voltage Equipment

Accurate Online Costing at Rivne Plant of High-Voltage Equipment

Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.

A unified IT-Enterprise ERP-system for Roshen Corporation

A unified IT-Enterprise ERP-system for Roshen Corporation

Thanks to the unified information platform implemented on all assets of Roshen corporation, the transparency and manageability of Roshen's business has increased.