Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Accurate Online Costing at Rivne Plant of High-Voltage Equipment
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.
A unified IT-Enterprise ERP-system for Roshen Corporation
Thanks to the unified information platform implemented on all assets of Roshen corporation, the transparency and manageability of Roshen's business has increased.