Aside section
Cases

SEMAF Factory, A.O.I. transformed R&D processes and minimized time-to-market on the IT-Enterprise platform
Using up-to-date PLM solutions has provided SEMAF Factory with tools for real-time responsiveness to market changes, additional customer requirements, deviations in the production process and finding growth areas through reengineering.

INTERPIPE reduced equipment downtime by 30% thanks to SmartEAM from IT-Enterprise
Implementation of IT-Enterprise EAM system let Interpipe holding to reduce maintenance costs, carry out production equipment repairs based on information about their current condition, ensure high reliability of equipment operation with preventive repairs where failure probability becomes high.

INTERPIPE implemented a digital production transformation project together with IT-Enterprise
Interpipe is an integrated pipe and wheel company, a member of the TOP 10 list of the world’s largest seamless pipes’ producers.

"Zorya"–"Mashproekt" reduced the time for technical preparation of production by 1/3 on the IT-Enterprise platform
Having an integrated ERP system from IT-Enterprise, Zorya-Mashproekt has successfully implemented a large-scale digital transformation project, switched to electronic document management and become more globally competitive.

"Zorya"-"Mashproekt" reduced time-to-market by 30% and accelerated preparation of product production on the IT-Enterprise platform by 40%
Zorya-Mashproekt (Gas turbine research & production complex, State Enterprise) is one of the largest manufacturing enterprises in Ukraine and part of the Ukrainian Defense Industries (Ukroboronprom) state corporation. The enterprise mostly produces gas turbine plants while its products are in great demand worldwide.

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

INTERPIPE organized optimal personnel selection using recruiting tools from IT-Enterprise
Optimal recruitment organized at the large industrial enterprise "Interpipe" with the help of IT-Enterprise solution.

"Zorya"–"Mashproekt" increased production output by 30% thanks to operational production control on the IT-Enterprise platform
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise
Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.