Aside section
Cases

"Zorya"–"Mashproekt" reduced the time for technical preparation of production by 1/3 on the IT-Enterprise platform
Having an integrated ERP system from IT-Enterprise, Zorya-Mashproekt has successfully implemented a large-scale digital transformation project, switched to electronic document management and become more globally competitive.

"Rivne High-Voltage Equipment Plant" implemented accurate online product cost planning together with IT-Enterprise
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.

INTERPIPE implemented an effective transformation of production using Smart Factory from IT-Enterprise
Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.

"Zorya"–"Mashproekt" increased production output by 30% thanks to operational production control on the IT-Enterprise platform
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production

Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.

JSC "FED" effectively manages operational production management with the help of Smart Manager from IT-Enterprise
FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.