Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Project for Olvia stevedoring company: from the transport center to the logistics platform
The experience of building a single information environment based on the industry-specific solution of e-Port IT-Enterprise system.
Industrial giant Zorya-Mashproekt digitalization reduced product development time by 1/3 and helped to enter new markets
Having an integrated ERP system from IT-Enterprise, Zorya-Mashproekt has successfully implemented a large-scale digital transformation project, switched to electronic document management and become more globally competitive.
Effective operational production management with the help of Smart Manager in JSC "FED"
FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.
Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.
30% Bigger Output with Operational Production Control at Zorya-Mashproekt
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production
SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe
Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.