Aside section
Cases
Transforming R&D processes and minimizing Time-to-Market at SEMAF Factory, A.O.I.
Using up-to-date PLM solutions has provided SEMAF Factory with tools for real-time responsiveness to market changes, additional customer requirements, deviations in the production process and finding growth areas through reengineering.
Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Industrial giant Zorya-Mashproekt digitalization reduced product development time by 1/3 and helped to enter new markets
Having an integrated ERP system from IT-Enterprise, Zorya-Mashproekt has successfully implemented a large-scale digital transformation project, switched to electronic document management and become more globally competitive.
Zorya-Mashproekt Digitalization Reduced Time-To-Market by 30%
Zorya-Mashproekt (Gas turbine research & production complex, State Enterprise) is one of the largest manufacturing enterprises in Ukraine and part of the Ukrainian Defense Industries (Ukroboronprom) state corporation. The enterprise mostly produces gas turbine plants while its products are in great demand worldwide.
Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise
Accurate Online Costing at Rivne Plant of High-Voltage Equipment
Thanks to the implementation of the IT-Enterprise system, operational control of direct cost is provided in real-time. Due to this, a deviation of the actual cost of production from planned to an amount not exceeding 1%.
“Kovalska” industrial and construction group: 2 times loss reduction because of using incorrect norms
How the industrial-construction group "Kovalska " reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise
Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system
Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.
The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise
Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.