Aside section
Cases
The indebtedness on all signed real property contracts has reduced by 70%
Increasing the efficiency of real estate sales processes by reducing by 70% the arrears of concluded contracts for real estate due to the IT-Enterprise solution
Interpipe's digital transformation of manufacturing
Interpipe is an integrated pipe and wheel company, a member of the TOP 10 list of the world’s largest seamless pipes’ producers.
Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Zorya-Mashproekt Digitalization Reduced Time-To-Market by 30%
Zorya-Mashproekt (Gas turbine research & production complex, State Enterprise) is one of the largest manufacturing enterprises in Ukraine and part of the Ukrainian Defense Industries (Ukroboronprom) state corporation. The enterprise mostly produces gas turbine plants while its products are in great demand worldwide.
Smart Manager electronic document management system in the Ministry of Education and Science of Ukraine
A 30% reduction in document processing time in the Ministry of Education and Science of Ukraine thanks to the introduction of the Smart Manager module of the complex ERP system IT-Enterprise.
Implementation of electronic document management based on IT-Enterprise Smart Manager in the Ministry of Infrastructure of Ukraine
Transition to the creation and processing of state-level documents in electronic form due to the introduction of an electronic document management system based on the SmartManager module of an integrated IT-Enterprise ERP system.
Effective operational production management with the help of Smart Manager in JSC "FED"
FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.
Thanks to IT Enterprise Smart Manager, Kyivvodokanal reduced document processing time by 24%
How, thanks to the implementation of IT-Enterprise.SmartManager, Kyivvodokanal reduced the processing time of documents by 24%
Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.