Aside section
Cases
Production Lead Time Reduced by 40-60% at Rivne Plant of High-Voltage Equipment
Rivne plant of high-voltage equipment reduced the manufacturing lead time of orders by 40-60% with the IT-Enterprise ERP system implementation
Smart Manager electronic document management system in the Ministry of Education and Science of Ukraine
A 30% reduction in document processing time in the Ministry of Education and Science of Ukraine thanks to the introduction of the Smart Manager module of the complex ERP system IT-Enterprise.
Implementation of electronic document management based on IT-Enterprise Smart Manager in the Ministry of Infrastructure of Ukraine
Transition to the creation and processing of state-level documents in electronic form due to the introduction of an electronic document management system based on the SmartManager module of an integrated IT-Enterprise ERP system.
Modern accounting tools allowed to detail cost structure
Implementation of the modern management ERP functionality in the industrial-construction group "Kovalska" for 4 months
Unified accounting system for a large distributed manufacturing enterprise
How IT-Enterprise team has created a unified accounting system in the large distributed enterprise "Antonov"
30% Bigger Output with Operational Production Control at Zorya-Mashproekt
How a science-and-production complex of gas turbines "Zorya" - "Mashproekt", one of the world's leaders, has achieved an increase of 30% of production output through operational control of production
SmartFactory by IT-Enterprise – a platform for sustainable development of Interpipe
Due to the implementation of the SmartFactory by IT-Enterprise, industrial holding "Interpipe" reduced the storage costs of materials, reduced the risk of breaking schedule routine and failure of the orders timing, improved the rhythm of the production, and significantly reduced equipment downtimes.
Effective operational production management with the help of Smart Manager in JSC "FED"
FED plant built a system of technical support and maintenance of the IT infrastructure and reduced the time of the documents handling by 45% due to the implementation of IT-Enterprise Smart Manager.
Thanks to IT Enterprise Smart Manager, Kyivvodokanal reduced document processing time by 24%
How, thanks to the implementation of IT-Enterprise.SmartManager, Kyivvodokanal reduced the processing time of documents by 24%
Lviv Locomotive Repair Plant doubled throughput and achieved 15-20% faster repair cycle
Similar to most machine-building enterprises, the Lviv Locomotive Repair Plant aimed to increase production throughput while ensuring a certain level of repair work profitability. In addition, the project team faced the task of improving the plant division’s manageability that required an integrated system covering all key departments and services.