Aside section
Cases

Arno Sport implemented retail chain management ecosystem with POS and electronic cash registers on the IT-Enterprise platform
Delta Sport has a sports and fashion retail chain of more than 40 stores in Ukraine and Kazakhstan. It also distributes Nike, Converse, Helly Hansen, and Speedo in 10 countries.

RUSH (EVA and VARUS) digitized procurement, received an economic effect from e-tenders of 250 million ₴ per year with SmartTender from IT-Enterprise
Systematization of procurement, better preparation of technical tasks, attracting more promising suppliers to our tenders.

"Epicenter K" simplified the process of preparing tenders and the time for document approval by 75% through the ForceBPM service from IT-Enterprise
The two most popular internal processes have been set up - coordination of participation in the tender for sale and coordination of a bank guarantee. This removed approximately 50% of the workload from the corporate customer service department.

INTERPIPE reduced equipment downtime by 30% thanks to SmartEAM from IT-Enterprise
Implementation of IT-Enterprise EAM system let Interpipe holding to reduce maintenance costs, carry out production equipment repairs based on information about their current condition, ensure high reliability of equipment operation with preventive repairs where failure probability becomes high.

Improving the predictability and manageability of the enterprise due to the cost accounting in production Lviv Locomotive Repair Plant
Reduction by 15-20% of critical repairs cycles to the Lviv locomotive repair plant (LLRZ) due to the implementation of operational accounting of production costs on the basis of IT-Enterprise

"Kovalska" reduced losses by 2 times due to the use of incorrect production standards on the IT-Enterprise platform
How the industrial-construction group "Kovalska" reduced costs and eliminated the use of incorrect norms due to the implementation of IT-Enterprise

JSC "FED" optimized the use of a high-cost tool based on the IT-Enterprise ERP system
How modern production enterprise, reduced by 15% cost of acquiring expensive tools due to implementation of the IT-Enterprise ERP system, which has a unique tool control and planning system.

Work-in-Progress at Kremenchuk Wheel Plant Reduced by 15% with Operational Production Planning
How the Kremenchug Wheel Plant reduced the volume of work in progress by 15% due to the operational planning system implementation based on the IT-Enterprise ERP system

The expenses of the auto complex at the Poltava Mining and Processing Plant are controlled by IT-Enterprise
Due to automation of cars departure planning and account technical readiness, staff of dispatchers at Poltava GOK was reduced by half; the formation of accompanying documents is also automated.